PC66/2 August 2017
There have been a lack up updates but this does not reflect the progress on the boat which continues. The deck is glued and taped on, hull is bulk faired and primed, engine and generator in and we are now well into the interior up the waist height and the systems which have been planned out. She’s got a duel voltage system 220v but ability to take 110v as well as a very neat Webasto aircon system which has an integrated diesel heater.