April Pilot Classic 55 Updates
The foam structure for the hull has been competed and lamination has started. You can see the cove line, hull windows and keel recess have all been prepared. The foam is specified in different densities depending on the load areas as specified by the designers. Its been a busy month ordering a lot of the equipment such as the engine, drive train, steering as well as much of the deck gear. Lamination should be completed by the end of the month and then probably in mid May the hull will be turned and the internal structure will be added.