June 2015 Pilot Classic 55 Update
June has been a month where the focus has been on the interior skin lamination and the start of the interior structure. The yard are looking to complete the interior structure and have the bulkheads in position by the end of July and then the preliminary installation work will commence. Most of the equipment including the rig, deck gear, steering system and engine have all been ordered during the month.